The milestones and their corresponding dates set forth by the ECEbot Power Upgrade team for the Fall 2006 semester are:

  • Build converter circuit on protoboard and test for project specifications.
    Septermber 29th

  • Build the over-voltage protection circuit and test for specifications.
    October 11th

  • Build the under-voltage protection circuit and test.
    October 20th

  • Combine modules and test final prototype.
    November 3rd

  • Create a PCB layout and arrange for fabrication of the board.
    November 8th

  • Assemble final prototype with PCB and test for specification compliance.
    November 27th